ELECTRICAL FAULT AT RBC
Roger Gatland has reported that a phase switch on the 3 phase power supply board has burnt out today. This means a loss of those electrical services on that phase.
Until we can get an electrical contractor on board we have no lighting in the clubroom and very little heating.
We may have to cancel the short mat on Saturday unless a quick repair is possible. Also the quiz on Saturday week may have to be postponed.
Updates will be posted here and on Facebook.